Events from the world, run through the method
Not a news feed. Every item is run through the same seven steps — situation, problem, implications, zoom out, zoom in, what a twin changes, and where it sat on the maturity scale. Work through three of them and you have learned the method.
We were not in the room. Every reading on this desk is an outside analysis of public reporting, written to show how the method is applied — not to allege what any organisation knew or decided. Where we go beyond the public record we say so in the text.
First-hand notes from engagements, published anonymised: no client, municipality or person is named, and figures that have not been audited are marked as estimates.
- 2026-10-07Recorded realitySvenskaResultatet: gemensam visning och spårbara videoexporter
Vad den lokala leveransen innehåller, vad modelljämförelsen stödjer och hur nästa förbättring kan utvärderas från samma kameror.
- 2026-10-07Recorded realitySvenskaSå byggdes arbetsflödet från panoramor och LiDAR till Gaussian splat
Bilderna ger träningsreferenser, registrerade kameror ger positioner och LiDAR ger startgeometri. Från källmaterial till daterad videoexport.
- 2026-10-07Recorded realitySvenskaFrån skanning till en fabrik att utforska
Panoramafoton, punktmoln och Gaussian splat i en gemensam vy. Så används befintligt skanningsmaterial i en lokal fabrikstvilling.
- 2026-08-06Logistics · MaritimeOn demand
Six days sideways, and a decade of supply-chain rethinking
Ever Given is the canonical example of a chokepoint everyone knew about and almost nobody had modelled.
Level 2 → 4Read the full reading → - 2026-08-06Ports · Transport infrastructureWeekly
The bridge was fine. The assumptions about ships were forty years old.
The Key Bridge collapse is a lesson about protective structures designed for a vessel class that no longer exists.
Level 2 → 4Read the full reading → - 2026-08-06Energy · GridWeekly
A peninsula went dark in five seconds
The April 2025 Iberian blackout is the clearest live demonstration that grids are now changing faster than the models used to run them.
Level 3 → 5Read the full reading → - 2026-08-06Aviation · EnergyWeekly
One substation fire closed Europe's busiest airport
Heathrow had backup power. The review found the issue was not whether resilience existed, but whether anyone had modelled the switchover.
Level 3 → 4Read the full reading → - 2026-08-06Software · Critical infrastructureWeekly
A single content update, eight and a half million machines
The 2024 CrowdStrike outage grounded flights and stopped hospitals. The defect was real, but the failure was the deployment model.
Level 2 → 4Read the full reading →
Looking for our own news and field notes instead? That is over here, and the longer arguments are in insights.
Nobody brings the full stack of digital twin competence — organizational, global, change management, technology strategy, and a NASA JPL-derived method — the way we do. We bring the best people together for a company faster than anyone else, and we implement it with them.
An answer that takes nine months to verify gets verified against a reality that has moved on.
Scoping workshop from €4,500, credited in full against the project. See how scoping works